How to write a government proposal that scores
A winning public sector proposal is organized around the solicitation's evaluation criteria, not around your company. Build a compliance matrix that maps every stated requirement to a page in your response, answer each criterion in the order and proportion the points table implies, and support claims with specific comparable projects and named people. Most losing proposals are well written but structured for the writer instead of the evaluator.
Start with a compliance matrix
Before writing a sentence, extract every requirement in the document — including the ones buried in the general terms and the attachments — into a table with three columns: the requirement, where it is stated, and where your response addresses it. Forms, certifications, bonds, insurance limits, and addendum acknowledgments belong in the same table.
This table is also worth including in the proposal itself. Evaluators use it to verify compliance quickly, and it makes a reviewer's shortcut work in your favor rather than against you.
Answer the criteria in the order they are scored
Mirror the solicitation's section structure and headings exactly. If it asks for technical approach, then experience, then personnel, then price, that is the order and those are the words. Evaluators fill out a scoring sheet section by section, and anything they have to hunt for tends to be scored as absent.
Length should follow weight. A 30-point criterion deserves more space than a 10-point one, and a section the document never asked about deserves none.
Make experience specific and verifiable
Past performance is where generic proposals lose most reliably. Replace claims of expertise with three to five comparable engagements: the buyer, the scope, the dollar value, the schedule performance, and a reference who has agreed in advance to answer the phone.
Comparable means comparable to this buyer. A similar project for another city carries more weight than a larger one for a private client, because the evaluator is trying to predict how you will behave inside a public process.
- Name the agency, the contract value, and the completion date for each reference project.
- State the outcome in numbers — schedule, budget variance, measured result.
- Warn your references before you submit and tell them what was asked.
- Do not reuse a reference project the evaluators can see was troubled; they often know.
Personnel and price
Name the actual people who will do the work, with resumes tailored to this scope and their committed time allocation. Bait-and-switch on key personnel is a known failure mode and many contracts restrict substitution after award.
Price with a short narrative that explains what is included, what assumptions the number rests on, and what would change it. On best value procurements, an unexplained low price reads as a misunderstanding of the scope, and an unexplained high one reads as padding.
Submit early and exactly as instructed
Format instructions are enforced. Page limits, font sizes, file naming, separate sealed price envelopes, and portal upload requirements are all grounds for rejection when ignored.
Deadlines are absolute and portals fail. Submit a day early. A complete proposal delivered late is worth the same as no proposal.
Last reviewed August 2026
How Hank automates this
Hank reads a published solicitation and returns the scope, key dates, submission requirements, evaluation criteria, and compliance items, then drafts a first-pass response from your own past winning work for your team to refine. The drafting starts from what your firm has actually done, not from a template.
See how Hank handles this →Common questions
Related guides
How government agencies evaluate bids
RFP, RFI, sources sought, and IFB — what each one means
DBE, MBE, and WBE certification for government work
What is Hank?
Hank helps companies find, pursue, and win construction and services work — public and private. On the public side, Hank reads more than 50,000 sources nationwide: active solicitations plus the budgets, board records, capital plans, grants, awards, forecasts, and expiring contracts that reveal work earlier. On the private side, Hank adds more than 2,500 new commercial projects every month, researched and confirmed by people and updated daily as each job moves from pre-design through planning, design, permitting, bidding, and construction. Hank matches both records to your services, territory, and project size; reads a published bid in 1–3 minutes; names the agency, owner, developer, general contractor, and architect contacts to call; answers pursuit questions; and, where enabled, assembles an editable proposal draft from your approved company knowledge. Your team gets 6–7 hours back each week and keeps every signal, source, contact, document, conversation, and pursuit in one connected record.