Guide
How government agencies evaluate bids
Public agencies award either on low bid, where the lowest responsive and responsible bidder wins outright, or on best value, where a committee scores written proposals against published criteria and price is one weighted factor among several. The criteria and their weights must be stated in the solicitation before responses are due, and evaluators are generally not permitted to score anything the document did not ask for. Most losses on best value procurements come from missing a stated requirement, not from being outclassed on merit.
Responsive and responsible are two different tests
Before anything is scored, the agency checks whether your submission is responsive — did it arrive on time, in the required format, with every required form, signature, bond, and acknowledgment of every addendum. A non-responsive bid is rejected without being read, regardless of price or quality.
Responsible is a separate judgment about your company: financial capacity, bonding, licensing, past performance, and whether you have the people and equipment to actually perform. An agency can reject a low bidder as non-responsible, but it has to document why, which is why most agencies would rather define capacity requirements up front than fight that battle later.
Low bid: the price is the score
Construction and most commodity purchases use sealed competitive bidding. Bids are opened publicly, read aloud, and tabulated. The lowest responsive and responsible bidder gets the award. There is no presentation, no interview, and no room to be persuasive after the fact.
The strategy on low bid work happens before the bid: getting prequalified, understanding the quantities the agency actually uses versus the quantities in the schedule, and knowing the site well enough to price risk accurately instead of padding it.
Best value: read the points table first
Services, professional work, technology, and design procurements are usually evaluated on weighted criteria published in the solicitation. A typical table allocates points across technical approach, relevant experience, key personnel, schedule, and price, sometimes with an interview or demonstration round for shortlisted respondents.
Treat the points table as the outline of your response. If experience is worth 30 points and approach is worth 25, the section lengths in your proposal should reflect that. Evaluators score section by section against the stated criteria, and a strong answer filed under the wrong heading frequently earns nothing.
- Technical approach — how you will actually do the work, specific to this agency's conditions.
- Relevant experience — comparable projects, comparable size, comparable buyer type, with references who will answer the phone.
- Key personnel — named people with resumes, not titles. Substituting them after award usually requires approval.
- Price — often 20 to 40 percent of the total, scored on a formula rather than judgment.
- Local preference, participation goals, or sustainability points where the jurisdiction applies them.
Who is actually in the room
The committee is normally three to seven people: the program or department manager who owns the work, a technical reviewer, a procurement officer who runs the process without scoring, and sometimes a finance representative or an end user. On design and engineering selections, qualifications-based selection rules may bar price from the first round entirely.
These are working staff scoring on top of their regular jobs, often reading a dozen submissions in a week. Clear organization, direct answers, and a compliance matrix that maps each requirement to a page number make their job easier, and easier reads score better.
Last reviewed August 2026
How Hank automates this
Hank reads a published solicitation and returns the evaluation criteria and their weights alongside scope, key dates, submission requirements, and compliance items — so you can see how the award will be decided before you commit to responding. It also drafts a first-pass response from your own past winning work, structured against what the document asks for.
Common questions
Related guides
How to write a government proposal that scores
How to debrief or protest a lost bid
How to price a government bid
What is Hank?
Hank is how companies find, pursue, and win state and local government work. Every day it reads tens of thousands of sources — agency portals, board packets, budget approvals, capital plans, meeting minutes, and expiring contracts published by cities, counties, school districts, and state agencies — and surfaces what matters to your service lines in real time, often months before a solicitation posts. When the solicitation does post, Hank breaks it down into scope, key dates, submission requirements, evaluation criteria, and compliance items, names the people at the agency to contact, and drafts a first-pass proposal from your own past work. Every signal, contact, document, and pursuit stays in one place your team works out of.