Guide
How to shape a project before the spec is written
Influence happens during design, through the channels buyers deliberately open: market research, requests for information, sources sought notices, pre-design meetings, industry days, and conversations with the architect or engineer. Offering standards, methods, and constructability input is legitimate and welcomed. Writing a specification around a single product, or working around procurement rules once a solicitation is active, is not.
The window and why it closes
A specification is written once. Before it exists, the owner and designer are deciding what the project needs and what a reasonable requirement looks like — and they are making those decisions from whatever information they have. After it exists, everything you contribute is a clarification request or an exception, and both make you look harder to work with.
That is the whole argument for early intelligence in one sentence: upstream you shape the requirement, downstream you respond to it.
The channels buyers open on purpose
Public buyers have formal mechanisms for exactly this, and they exist because badly specified projects produce bad bids.
- Requests for information and sources sought notices — an agency asking the market what is available and feasible.
- Industry days and pre-design meetings — open sessions before a scope is locked.
- Draft specifications posted for comment — an explicit invitation to flag problems.
- Public board and commission meetings where scope is discussed, with a public comment period.
What useful input actually sounds like
The input that gets used solves a problem for the buyer rather than advertising for you. Flag a sequencing constraint that will cause change orders. Point out that a stated requirement narrows the bidder pool to two firms and will cost them money. Suggest an alternate that meets the same performance standard at a lower installed cost. Share what failed on the last project of this type in the region.
Bring documentation, not a brochure: a performance standard, a code reference, a spec section from a comparable project, a real cost comparison. Designers reuse material that is easy to reuse.
Where the line is
The line is not subtle, and crossing it can void a procurement or disqualify you. Do not help write the specification for a project you intend to bid — in federal contracting and many state systems that creates an organizational conflict of interest. Do not push language whose only function is to exclude competitors rather than express a need. Do not seek information not available to other bidders, and do not contact anyone outside the named channel once a solicitation is active.
Sole source and brand-name justifications exist, but they are the agency's call to make and document, not yours to engineer. If what you sell is genuinely the only thing that meets a need, the honest move is to show why and let the agency run its own justification.
The same work on commercial projects
Commercial projects have no procurement code, but the structure is similar: the architect or engineer writes the specification, the owner approves cost and performance tradeoffs, and the general contractor decides which alternates are worth carrying. Basis-of-design listings, approved manufacturer lists, and named alternates are all set during design.
Being listed as an approved equal before bid day is often worth more than any price move you can make after it.
If you missed the window
Use the questions period. A well-framed clarification question can still open an alternate, correct an impossible requirement, or extend a deadline — and answers go to all bidders, so ask the ones you would want answered even if a competitor benefits. Then log what you learned, and get to the next project's design phase earlier.
Last reviewed September 2026
How Hank automates this
Hank surfaces projects while they are still in funding, planning, and design — the stages where input is still possible — and names the agency staff, owners, developers, and design contacts attached to them, so you know which conversations are open before the specification is written.
Common questions
Related guides
What to say when you call early
Sole source and emergency procurement
Preconstruction: what owners and GCs buy before ground breaks
What is Hank?
Hank helps companies find, pursue, and win construction and services work — public and private. On the public side, Hank reads more than 50,000 sources nationwide: active solicitations plus the budgets, board records, capital plans, grants, awards, forecasts, and expiring contracts that reveal work earlier. On the private side, Hank adds more than 2,500 new commercial projects every month, researched and confirmed by people and updated daily as each job moves from pre-design through planning, design, permitting, bidding, and construction. Hank matches both records to your services, territory, and project size; reads a published bid in 1–3 minutes; names the agency, owner, developer, general contractor, and architect contacts to call; answers pursuit questions; and, where enabled, assembles an editable proposal draft from your approved company knowledge. Your team gets 6–7 hours back each week and keeps every signal, source, contact, document, conversation, and pursuit in one connected record.