Tenant improvement work — the build-out of leased space for a new or renewed tenant — starts with a lease, not a permit. The reliable early signals are lease transactions and space listings coming off the market, tenant announcements and relocations, interior alteration permit filings, and the architects and project managers who specialize in interiors. By the time an interior permit is filed, the contractor is usually already chosen, so the useful work happens in the lease-to-design window.

What counts as tenant improvement work

Tenant improvement, TI, or fit-out work is the interior construction that makes leased space usable for a specific occupant: demolition of existing partitions, framing and drywall, ceilings, flooring, electrical and data, mechanical modifications, plumbing, millwork, finishes, and signage.

It is a distinct market from ground-up construction. Projects are smaller, schedules are shorter, the buyer is often a tenant or a property manager rather than a developer, and the work repeats — a landlord with thirty buildings generates fit-out work continuously.

  • Office suites and full-floor relocations
  • Retail and restaurant build-outs, including landlord white-box work
  • Medical and dental offices, which carry heavier mechanical and infection-control requirements
  • Industrial and warehouse office areas, mezzanines, and racking-driven modifications
  • Refresh and re-tenanting work when a lease turns over

The signal chain, earliest to latest

Each stage narrows the field. The firms that win consistently are working the first two.

  • A lease is signed or a space comes off the market — the build-out decision follows within weeks
  • A tenant announces a relocation, expansion, or new location
  • An interior designer or architect is engaged and begins test fits
  • Drawings go out for pricing, usually to a short list assembled by the property manager or tenant rep
  • An interior alteration permit is filed — informative, but late for bidding

Who actually hires you

TI work has more possible buyers than ground-up work, and knowing which one controls the job changes who you call.

  • Property managers and asset managers at the landlord, who control landlord-funded improvements and standing vendor lists
  • Tenant representatives and corporate real estate managers, who control tenant-funded work
  • Interior architects and designers, who often recommend the contractor short list
  • Project management firms hired to run the move on the tenant's behalf
  • General contractors who specialize in interiors and buy trade packages

Get on the standing lists

Most fit-out work never reaches an open bid. It goes to a short list the property manager or interiors GC already keeps, because the schedules are tight and the buildings are occupied. Getting onto those lists is the highest-return activity in this market.

What gets you on: proof you have worked in occupied buildings, a clean safety and insurance package, references from building engineers, and availability. What keeps you on: showing up for the small jobs that nobody else wants at the price they are worth.

Price the conditions, not just the scope

A fit-out in an occupied Class A building is a different job from the same square footage in a vacant shell. Freight elevator windows, after-hours noise rules, protection of common areas, badging, and inspection sequencing all drive labor, and none of them appear on the drawings.

Walk the space before pricing, and write the conditions you assumed into the proposal. On medical work, add the infection-control and containment requirements as priced line items rather than absorbing them.

Repeatability is the whole point

One good landlord relationship produces work every quarter for years. Track the buildings in your territory, who manages each one, and when major leases expire, and you can predict your own pipeline instead of reacting to invitations.

Last reviewed September 2026

How Hank automates this

Hank tracks commercial projects from the earliest stage through construction, including interior and fit-out work, with 2,500+ new commercial projects added a month, each verified by a person and carrying owner, developer, general contractor, and architect contacts. Records are updated as projects move, so a space that was a lease signal last quarter shows up as a design-stage job with names attached when it is time to call.

Common questions

Related guides

What is Hank?

Hank helps companies find, pursue, and win construction and services work — public and private. On the public side, Hank reads more than 50,000 sources nationwide: active solicitations plus the budgets, board records, capital plans, grants, awards, forecasts, and expiring contracts that reveal work earlier. On the private side, Hank adds more than 2,500 new commercial projects every month, researched and confirmed by people and updated daily as each job moves from pre-design through planning, design, permitting, bidding, and construction. Hank matches both records to your services, territory, and project size; reads a published bid in 1–3 minutes; names the agency, owner, developer, general contractor, and architect contacts to call; answers pursuit questions; and, where enabled, assembles an editable proposal draft from your approved company knowledge. Your team gets 6–7 hours back each week and keeps every signal, source, contact, document, conversation, and pursuit in one connected record.